Why the workbook includes multiple examples
Each fixture is intentionally small enough to audit in Excel. Together they exercise the common model compiler across fundamentally different mathematical structures.
They are not nine hard-coded Python programs. The notebook reads the same tables and determines which model is active from the shared Model ID.
Example matrix
| Model ID | Example | Family | Main concept |
|---|---|---|---|
product_mix |
Product Mix | LP | Linear objective, resource constraints, LP marginals |
workforce |
Workforce Scheduling | MILP | Integer decisions and covering constraints |
portfolio |
Portfolio Allocation | QP | Quadratic risk objective and return constraint |
marketing |
Marketing Allocation | NLP | Diminishing-return nonlinear objective with budget constraint |
parameter_fit |
Parameter Estimation | Least squares | Nonlinear residual fitting |
equations |
Nonlinear Equations | Equations | Bounded nonlinear system |
goal_plan |
Goal-Based Planning | Multiobjective | Cost/emissions Pareto frontier |
multimodal |
Multimodal Design | Global | Local versus global search |
infeasible |
Infeasible Capacity Plan | LP diagnostics | Explicit infeasibility |
1. Product Mix — linear programming
Business question
How many chairs and desks should be produced to maximize contribution margin under labor, material, and desk-demand limits?
Decision variables
chairs >= 00 <= desks <= 50
Objective
\[\max 45\,chairs + 80\,desks\]
Constraints
\[2\,chairs + 4\,desks \le 240\]
\[3\,chairs + 5\,desks \le 300\]
Expected baseline
The validated baseline returns:
- Chairs ≈ 16.6667
- Desks = 50
- Objective = 4,750
- Status =
OPTIMAL
What to inspect
- Which resource constraint is binding?
- What marginal value does HiGHS report for relaxing a binding resource?
- Is the desk upper bound active?
Scenario
High margin desks changes the desk objective coefficient from 80 to 95 without rewriting the base model.
MATLAB analogue
This corresponds to the LP modeling territory served by MATLAB linprog, while the workbook uses SciPy/HiGHS and a tabular model definition.
2. Workforce Scheduling — mixed-integer linear programming
Business question
How many workers should start on each day of the week so daily staffing requirements are covered with the fewest total starts?
Decision variables
Seven nonnegative integer start variables:
start_monstart_tuestart_wedstart_thustart_fristart_satstart_sun
Objective
Minimize the sum of all weekly shift starts.
Constraints
Each day has a minimum staffing requirement. Constraint terms encode which start days contribute coverage to each calendar day.
The long-form coefficient table is important here: the model is sparse and readable without a manually constructed matrix in Python.
Expected result
The validation contract requires:
- detected class
MILP; - solver
HiGHS MILP; - status
OPTIMAL; - integral decision values;
- all daily coverage constraints independently feasible.
What to change
Increase one daily requirement and observe whether the integer schedule changes discretely rather than smoothly.
MATLAB analogue
Comparable problem family: intlinprog.
3. Portfolio Allocation — quadratic objective
Business question
Allocate a portfolio across equity, bonds, and cash to minimize modeled variance while remaining fully invested and meeting a minimum expected return.
Decision variables
equitybondscash
Each is bounded between 0 and 1.
Linear constraints
Full investment:
\[equity + bonds + cash = 1\]
Minimum expected return:
\[0.11\,equity + 0.055\,bonds + 0.02\,cash \ge 0.07\]
Quadratic risk terms
The Quadratic sheet contains diagonal and cross terms representing a small covariance-style risk objective.
Solver semantics
The current beta uses SLSQP rather than a dedicated QP solver. The validated status is therefore LOCAL_OPTIMUM, not a generic claim that every authored quadratic problem has a convex-QP certificate.
Scenario
Higher return target raises the return lower bound to 8.5%.
What to inspect
- Which assets hit bounds?
- How does the allocation shift when the return floor rises?
- Does independent feasibility still show full investment and return compliance?
MATLAB analogue
Comparable mathematical territory: quadprog, but with a different current backend and weaker QP-specific diagnostics.
4. Marketing Allocation — constrained nonlinear optimization
Business question
Allocate a fixed marketing budget across Search, Social, and Email when each channel has diminishing returns.
Variables
searchsocialemail
Each is bounded from 0 to 100.
Objective
The safe worksheet expression is:
120*log(1+search) + 90*sqrt(social) + 60*log(1+email)
The supplied fixture maximizes this response.
Constraint
\[search + social + email \le 100\]
Scenario
Tight budget changes the budget upper bound from 100 to 75.
Why it is useful
This fixture demonstrates that an Excel user can inspect the actual nonlinear formula without granting worksheet text arbitrary Python execution.
Solver semantics
SLSQP returns a local constrained result. The notebook then recomputes the budget and bounds before accepting LOCAL_OPTIMUM.
MATLAB analogue
Comparable problem class: constrained nonlinear optimization with fmincon.
5. Parameter Estimation — nonlinear least squares
Business question
Fit saturation parameters to six observations.
Parameters as decisions
vmax— maximum responsekm— half-saturation parameter
Data
The observed x/y pairs are stored as scalar Parameters so the residual formulas remain readable.
Residual form
For observation \(i\):
\[r_i = \frac{vmax\,x_i}{km+x_i} - y_i\]
The solver minimizes the sum of squared residuals subject to parameter bounds.
What to inspect
- fitted
vmaxandkm; - residual objective;
- whether the solution hits parameter bounds;
- whether different sensible starting values reach a similar fit.
MATLAB analogue
Comparable territory: lsqnonlin / lsqcurvefit.
6. Nonlinear Equations
Business question
Find bounded values of x and y satisfying:
\[x^2 + y = 5\]
\[x + y^2 = 5\]
with both variables between 0 and 5.
Implementation
The Expressions sheet stores two Equation rows:
x**2 + y - 5
x + y**2 - 5
The notebook solves the residual system with least_squares and checks the residual norm.
Status
The correct semantic result is FEASIBLE_SOLUTION when the residuals are sufficiently close to zero. The workbook does not call an equation root an optimization optimum.
MATLAB analogue
Comparable system-solving territory: fsolve.
7. Goal-Based Planning — multiobjective optimization
Business question
Choose standard and green supply to satisfy demand while exposing the tradeoff between cost and emissions.
Variables
standardgreen
Constraint
\[standard + green \ge 100\]
Objective 1: Cost
\[70\,standard + 90\,green\]
Objective 2: Emissions
\[6\,standard + 2\,green\]
Method
The Toolbox does not hide the tradeoff in one arbitrary weighted sum. It:
- finds the endpoint that minimizes Cost;
- finds the endpoint that minimizes Emissions;
- sweeps an emissions epsilon bound;
- minimizes Cost at each bound;
- publishes the nondominated frontier.
What to inspect
- the shape of the Pareto tradeoff;
- which frontier points materially improve emissions for modest cost;
- whether the selected representative solution is actually the organization’s preferred point.
MATLAB analogue
This is multiobjective capability, but the method differs from MATLAB fgoalattain, fminimax, gamultiobj, or paretosearch.
8. Multimodal Design — bounded global search
Objective
The included objective is the Himmelblau function:
\[f(x,y)=(x^2+y-11)^2+(x+y^2-7)^2\]
with:
\[-5 \le x \le 5\]
\[-5 \le y \le 5\]
It has multiple local minima, making it useful for showing why one local nonlinear solve is not the same as a global search.
Methods compared
- SLSQP local solve
- seeded MultiStart
- Differential Evolution
- SHGO
What to inspect
- objective values across methods;
- evaluation counts;
- runtime;
- feasibility;
- seed dependence for stochastic/repeated-start paths.
Status
The global workflow reports BEST_FOUND, even when several methods agree. Agreement is useful evidence but not converted into an unsupported global certificate.
MATLAB analogue
This example covers the problem domain of Global Optimization Toolbox, but it uses SciPy global methods rather than cloning MATLAB’s GlobalSearch, genetic algorithm, particle swarm, or pattern-search implementations.
9. Infeasible Capacity Plan — failure diagnostics
Model
Variables x and y are nonnegative.
Constraints require both:
\[x+y \ge 10\]
and:
\[x+y \le 5\]
Why ship an infeasible example
Operational optimization models regularly become infeasible because constraints are authored by different stakeholders or because a scenario makes targets mutually inconsistent.
A proper workbench should demonstrate that it:
- reports infeasibility clearly;
- does not publish a fabricated optimal decision vector;
- preserves solver termination evidence;
- gives reviewers a reproducible failure case.
MATLAB analogue
The problem family is still LP, but the pedagogical focus is result interpretation and diagnostics rather than successful optimization.
Turn an example into an operational model
The supplied fixtures are deliberately compact. To adapt one:
- Preserve the schema, not the sample business labels.
- Create a new Model ID rather than overwriting an acceptance fixture when you want both to remain available.
- Add your domain-specific constraints and scenarios.
- Set objective direction explicitly.
- Add offline expectations for at least a baseline and a meaningful changed-input case.
- Add an infeasible/stressed case when operational rules can conflict.
- Benchmark runtime using realistic row counts and nonlinear evaluation cost.
See the Modeling guide for the exact schema and Reference for input-band limits.